Classic AutoAir Perfect Fit-Elite Series Instrucciones de operaciones Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
16
Route the heater hoses that were attached to the
bulkheads, and attach to the heater fittings on the front
of the unit.
Attach using (2) worm gear clamps provided.
Locate the firewall blockoff, (1) ¼”-20 x 5/8 hex head screw, (3) ¼”-20 flange nuts, and (3)
#10 x ¾ “ tek screws.
Insert the Blue clutch wire and the Temp control cable through the ½” plastic grommet in the
firewall blockoff.
Slide the blockoff over the suction tube, heater bulkheads, and insert the liquid tube through the
hole in the bulkhead.
The blockoff will slide over the studs at the bottom of the mounting bracket.
Attach blockoff using the flange nuts at bottom, (3) #10 tek screws across the top, and (1) ¼”
bolt and nut from the inside of firewall on the bottom left. Seal around a/c hoses using the
insulation tape supplied.
Locate in the hardware sack kit (1) single face outlet and (2)
#10 x ¾” tek screws.
STUDS
#10 SCREWS#10 SCREW
¼” – 20 X 5/8
SCREW & NUT
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 30 31

Comentarios a estos manuales

Sin comentarios